Wash Pad Demonstruction – Final Construction Activities

Construction on the wash pad prototype demonstration at Locust Hill Country Club is in the final construction stages (see the blog post describing the project and the blog post on mid-construction activities).

Below are photos showing the testing of the last component of the system, the booster pump, and construction of a level pad next to the existing wash pad for the equipment to be placed on. The booster pump will take water from the supply tank and pump it into the hoses used to clean equipment. As part of this process, the operating pressure and GPM were measured and determined to be within range engineered for the system.